Conch Republic Parking Lot

Line drawing of a proposed parking lot.

  • Project Stage: Project Development/Design
  • Construction Begin Estimate: Late 2026/ Early 2027
  • Intent: Renovation to the existing parking lot including redevelopment of the gravel parking lot and the Ice House building.  The project will redeveloped the layout with the intent to maximize space, assist with functionality, install new landscaping, and upgrade stormwater infrastructure to alleviate flooding issues. 
  • Project Updates:
    • Key West Bight Management District Board (link)